BROADMOOR HOSPITAL

About

The customer required a quick delivery of a Riello UPS for their door security control system, which worked in conjunction with a the largest internal battery allowed as floor space was a premium.

Brief

Critical Power Supplies proposed a Riello Three Phase 20KVA long runtime solution in comprehensive fixed price turnkey package which delivered a maintained solution which provided all the features the customer require within the budget available. This gave the security department complete redundancy in case of failure at any point and allowed batteries to be replaced in years to come without having to switch off the load by utilizing the bypass system. Combing the UPS efficiency and reliability with our ability to deliver a turnkey installation with comprehensive project management allowed us to deliver costs savings though a quick-roll out and integration, that traditional procurement methods would not have been able to manage. The UPS was also supplied with a remote monitoring panel to allow the security team to easily integrate the status of the UPS.

Outcome

The installation was completed in 2 days including the disposal of the legacy Chloride UPS Solution.

How can we help?