Critical Power Supplies - Facebook-double Critical Power Supplies - Twitter-double Critical Power Supplies - Linkedin-double Critical Power Supplies - Google-plus-double 24 Hour: 0800 978 8988 Int: +44 (0)1844 340122

Huawei Containerised UPS Solutions

Published by Jason Koffler on 05 September 2014

IDS1000 All-in-one container data center

The All-in-One container data center solution functions as a foundation for cloud computing in enterprise data centers. It meets the requirements of telecom operators and Internet service providers for environmental protection, energy conservation, and fast deployment. In addition, it has distinct advantages in scenarios such as disaster relief operations, military operations, oil exploration, and enterprise data management

Critical Power Supplies - Huawei Containerised UPS Solutions image 1

Click here to download the One Container Datacentre Specification

Design prevents wind and sand from entering the equipment compartment when doors are open for maintenance.
The All-in-One is characterized by optimal electromagnetic compatibility (EMC) and protection against external damage.

Fast Deployment – The cooling system, power distribution system, monitoring system, security system, and cabinets are installed before delivery. The solution’s streamlined manufacturing and installation processes take less than 10 weeks to complete.

Critical Power Supplies - Huawei Containerised UPS Solutions image 2

Cost Effectiveness and Energy Saving – One stop solution, integrated all of systems, which simplifies the installation. The hot and cold aisles are separated in the equipment compartment to ensure high cooling efficiency. PUE<1.6

Optimal Reliability and Security
The two-porch design prevents wind and sand from entering the equipment compartment when doors are open for maintenance. The All-in-One is characterized by optimal electromagnetic compatibility (EMC) and protection against external damage.

Optimal Reliability and Security

- The two-porch design prevents wind and sand from entering the equipment compartment when doors are open for maintenance.
- The All-in-One is characterized by optimal electromagnetic compatibility (EMC) and protection against external damage.
- Fast Deployment
- The cooling system, power distribution system, monitoring system, security system, and cabinets are installed before delivery. The solution’s streamlined manufacturing and installation processes take less than 10 weeks to complete.
- Cost Effectiveness and Energy Saving
- One stop solution, integrated all of systems, which simplifies the installation.
- The hot and cold aisles are separated in the equipment compartment to ensure high cooling efficiency. PUE<1.6

Example of Rental Costs.

6 Month Rental Option (Subject to site survey and address confirmation) GBP (£) ex VAT
Monthly Rental (£) £ 12,095
Total Rental (£) £ 66,570
Delivery & Collection £ 12,256
Installation, Commissioning & Decommissioning £ 12,550
Support Enhanced Maintenance Service with 7×24 Onsite Support 4hour response £ 24,115
Total Rental (£) £ 127,586