Secure Checkout
UK-Based Company
Manufacturer Warranty
Call Us: 0800 978 8988
Sale!

Eaton 5PX Gen2 UPS, 2200 VA, 2200 W, Input: C20, Output: (8) C13, (2) C19, Rack/tower, 2U, Network card included, with BS input cord - 5PX2200IRTNG2BS

  • ✔ Trusted UK Supplier
  • ✔ Fast UK Delivery Available
  • ✔ Manufacturer Warranty Included
  • ✔ Expert Advice Available
  • ✔ Protects equipment from power loss
  • ✔ Prevents downtime and data loss
  • ✔ Suitable for business and home setups

    £1304.77 Ex VAT
    £1565.72 Inc VAT

    Delivery Costs

    Find below some of our pricing costs for Critical Power Supplies online store.

    England, Wales and Scottish Lowlands

    2 to 3 Working Days - £4.99.
    Next Working Day - £9.99.
    Pre Noon, Pre 10:30am - Contact Us.

    Scottish Lowlands Postcodes
    AB1 - AB3, AB23, AB30 - AB36, AB41 - AB45, AB51 - AB55, DD4, DD7, DD8, DD11, FK17, G84, PA20 - PA33, PA35 - PA37, PA41 - PA49, PA60 - PA68, PA70 - PA78, FK10, DG1 - DG14, DG16, DD1, DD2, DG7, KA1 - KA30, PA17, G60 - G62, G64, G66, G81, EH21, EH31 - EH36, EH39, EH40 - EH42, G46, G77, G78, PA1, PA3 - PA10, PA12, EH1 - EH10, EH12 - EH17, EH21, EH28, EH29, FK1 - FK6, DD6, KY1 - KY12, KY14 - KY16, G1 - G5, G9, G11, G12, G14, G15, G20, G21, G31, G32, G40 - G43, G45, G51, G53, G76, IV1 - IV28, IV40 - IV49, IV51 - IV56, KW1 - KW3, KW5 - KW14, PA39, PA40, PH19 - PH25, PH30 - PH44, PA10, PA13, PA15, PA16, PA18, PA19, EH10, EH18, EH19, EH23 - EH26, EH37, AB38, AB56, IV30 - IV32, IV36, EH46, G33, G67 - G69, G71 - G75, ML1 - ML11, KW1, KW15 - KW17, PH1 - PH10, PH13 - PH18, EH26, EH38, EH43 - EH45, TD1 - TD12, TD14, TD15, ZE1 - ZE3, FK6, G63, EH27, EH47 - EH49, EH52 - EH54, HS1 - HS9

    Highlands, Northern Ireland, Channel Islands and Ireland

    • Scottish Highlands
      3 to 5 Working Days - £20

      Scottish Highlands Postcodes
      AB32, AB36 - AB38, AB40 - AB42, AB55, AB56, FK17 - FK99, G83, HS1 - HS9, IV1 - IV29, IV33 - IV63, KA27, KA28, KY1 - KY16, KW1 - KW18, PA20 - PA49, PA60 - PA78, PH17 - PH26, PH30 - PH44, PH49, PH50, ZE1 - ZE4

    • Northern Ireland
      3 to 5 Working Days - £50

    • Channel Islands
      3 to 5 Working Days - £25

    • Ireland
      5 to 7 Working Days - £99

    • Western Europe
      5 to 7 Working Days - £150 DAP
      DAP / Delivered at Place - The seller is deemed to have delivered when the goods are placed at the disposal of the buyer on the arriving means of transport and ready for unloading at the named place of destination. Under DAP terms, the buyer is liable for the freight insurance, import taxes, customs brokerage, and any expenses incurred to unload the cardo from the container at the final destination.

    Purchase this item and get 13047 Points - equivalent to the value of £13.05

    In Stock — 81 available to order

    Delivery
    Delivery options, charges and estimated delivery times are shown at checkout.
    Need this urgently? Contact Sales to confirm availability and delivery options.
    Call 0800 978 8988

    All major debit and credit cards accepted.

    Introducing the latest addition to Eaton’s 5 series UPS line, the Eaton 5PX G2 rackmount and tower UPS provides the maximum power possible at each power rating. The 5PX G2 UPS has power ratings ranging from 1 to 3 kVA, with low and high voltage options and offers up to four optional external battery modules for extra runtime. With select 2 and 3 kVA models, the 5PX G2 UPS offers a reduced depth that conserves space for high-density wall mount rack installations.

    Applications include: Enterprise and distributed IT, telecom, retail, banks, IDF, small business, long runtime needs.

    Connected equipment may include: Servers (including VoIP), storage, networking equipment, switches (including PoE) and other IT equipment.

    5PX G2 UPS features include:

    Deployment simplified: The 5PX G2 UPS offers mass UPS firmware upgrades without dropping the load and provides an easy startup configuration wizard simplifying your UPS setup process.

    Runtime: Increased standard runtime by at least 25% on 1.5 and 2 kVA models compared to the original 5PX UPS.

    Stay connected, securely: Reduce the risk of intrusion with the optional Gigabit Network Card (NETWORK-M2), which is the first UPS connectivity device to meet both UL and IEC cybersecurity standards.

    Enhanced surge protection: The 5PX G2 provides enhanced surge protection keeping your branch offices and IT closets equipment safe.

    Power
    Output power factor 1
    Output power 2200 W
    Input operation voltage (min) 150 V
    Input operation voltage (max) 294 V
    Output operation voltage (min) 200 V
    Output operation voltage (max) 240 V
    Power factor 1
    Output power capacity 2.2 kVA
    Ports & interfaces
    Cable length 1.8 m
    USB port Yes
    Serial interface Yes
    Serial interface type RS-232
    AC outlets quantity 10 AC outlet(s)
    AC outlet types C13 coupler, C19 coupler
    Power plug C20 coupler
    USB 2.0 ports quantity 1
    Serial ports quantity 1
    USB port type USB Type-B
    Performance
    UPS topology Line-Interactive
    Waveform Sine
    Automatic Voltage Regulation (AVR) Yes
    Number of output phases 1
    Number of input phases 1
    Power protection features Overdischarge
    Noise level 40 dB
    Features
    Output frequency 50/60 Hz
    UPS topology Line-Interactive
    Waveform Sine
    Automatic Voltage Regulation (AVR) Yes
    Number of output phases 1
    Number of input phases 1
    Output power factor 1
    Output power 2200 W
    Input operation voltage (min) 150 V
    Input operation voltage (max) 294 V
    Output operation voltage (min) 200 V
    Output operation voltage (max) 240 V
    Power protection features Overdischarge
    Power factor 1
    Noise level 40 dB
    Output power capacity 2.2 kVA
    Input frequency 47/70 Hz
    Battery
    Number of batteries supported 6
    Battery voltage 12 V
    Battery capacity 7 Ah
    Battery technology Sealed Lead Acid (VRLA)
    Automatic battery test Yes
    Design
    Form factor Rackmount/Tower
    Product colour Black, Silver
    Display LCD
    Certification IEC/EN 62040-1 IEC/EN 62040-2 IEC/EN 62040-3 UL 1778 CSA 22.2 cTUVus EAC Cm UKCA Ukr KCC
    Cable length 1.8 m
    Operational conditions
    Operating temperature (T-T) 0 – 40 °C
    Operating relative humidity (H-H) 0 – 90%
    Operating altitude 0 – 3000 m
    Technical details
    Output frequency 50/60 Hz
    Sustainability compliance Yes
    Sustainability certificates CE, ENERGY STAR, REACH, RoHS
    Weight & dimensions
    Weight 28.7 kg
    Width 588 mm
    Height 240 mm
    Depth 770 mm
    Packaging data
    Quick installation guide Yes
    Cables included Input power cable, Serial, USB cable
    Rack mount kit Yes
    Certificates
    Certification IEC/EN 62040-1 IEC/EN 62040-2 IEC/EN 62040-3 UL 1778 CSA 22.2 cTUVus EAC Cm UKCA Ukr KCC
    Packaging content
    Quick installation guide Yes
    Cables included Input power cable, Serial, USB cable
    Rack mount kit Yes

    Nationwide Onsite Maintenance is as easy as saying Bronze, Silver, Gold, Platinum.

    1: Plug and Play (400VA-3kVA) – Extended Warranty Contracts and Maintenance contracts

    For plug & play UPS Critical Power offers you a full range of distributed service packs. These competitively priced turn-key solutions optimize your UPS performances and enhance the availability of your equipment while meeting your financial constraints and technical requirements.

    Warranty Plus Extends your standard warranty up to 6 years, next working day replacement* with labour or without. Green tick
    Intervention, Provides one preventative maintenance visit, planned visit inside our outside hours. Green tick
    Battery Plus, Provides replacement batteries to site, next working day replacement or same day Green tick

    2: Hardwired (4kVA Upwards including Three Phase UPS) – Maintenance Contracts

    No matter what, your UPS, Generator, Cooling, Switchgear or Electrical Hardware must be ready to perform at all times. While every power solution we supply is backed-up by a comprehensive warranty with the manufacturer, maintenance plans to ensure business continuity are highly recommended, particularly for UPS systems from 4kVA. In particular, the battery set is of prime importance, and must be in good working order. With other consumables, such as fans and DC capacitors requiring regular maintenance and inspection logs reviewed to predict potential future problems.

    Services Included

    Silver Level

    Gold Level

    Platinum Level

    Platinum Plus

     

    Technical Hotline 24/7 Yes Yes Yes Yes Green tick
    Preventative Maintenance Yes Yes Yes Yes Green tick
    Remote Monitoring 24/7 Yes Yes Yes Yes Green tick
    Firmware Upgrades Yes Yes Yes Yes Green tick
    Emergency Response Yes Yes Yes Yes Green tick
    Labour Yes Yes Yes Yes Green tick
    Parts Yes Yes Yes option Green tick
    Monthly Event/Status Report option option option option Green tick
    Onsite Crash Kit option option option onsite Green tick
    Response Time 12 working hours 8 working hours 4 clock hours 4 clock hours Green tick
    Guaranteed Fix time – – – 4 Clock hours Green tick

    3: 24×7 Remote Monitoring Contracts –

    Remote monitoring of UPS, Generators, Air Conditioning, Site Access and Environmental Systems is essential to allow swift offsite investigation of fault reports and real-time monitoring of the site status, allowing the correct response to be created and dispatched to site.

    Engineer Installation and configuration during normal hours Green tick
    24×7 flexible status and remote monitoring. Green tick
    Encrypted communication, allowing safe offsite monitoring Green tick
    Alarms and events emailed and SMS texted automatically Green tick
    Firewall Friendly Green tick
    Cloud based status overview and multiple sites status on one screen Green tick
    Allows First Fix Response to Site Green tick

    4. IR Thermal Imaging Surveys – Infrared electrical inspection. Infrared electrical testing finds hot, dangerous problems quickly. Infrared electrical inspections find hot spots caused by defects in connections and components. – Contact us for more information.

    Detect system overloads, loose defective components and damaged switchgear. Infrared electrical testing finds hot, dangerous problems quickly. Infrared electrical inspections find hot spots caused by defects in connections and components.

    Infrared thermography is used to find areas of excess heat (caused by increased resistance) so that problems can be corrected before a component fails, causing damage to the component, creating safety hazards and productivity loss. Because increased heating is a sign of failure, infrared is the best diagnostic tool available for finding these hot connections in the early stages of degeneration.

    5. Switchgear – Contact us for more information.

    Switchgear maintenance is essential for efficient save plant operation and prolonged life span in the field Switchgear should be maintained as follows.

    • Live Maintenance – Unintrusive and consists of taking metering values, carrying out visual inspections and a thermal imaging survey of the switchboard. This is recommended to be carried out yearly.
    • Breaker Maintenance – Switchboard would need to be Isolated and all ACB’s and MCCB’s are maintained including visual and mechanical checks, greasing and secondary injection testing of the trip units. This is recommended to be carried out every 2 years.
    • Full Isolated Maintenance – Switchboard would need to be fully isolated from upstream supplies (HV). Breakers are maintained as per the above but also full maintenance carried out of the Switchboard to clean all compartments and carry out tightness checking of busbars and terminations etc. This is recommended to be carried out every 4 years.

    Customers also bought…

    We are here when you need us most

    As a client of Critical Power Supplies you can expect 24×7 support whether on the phone, email or on site because we always deliver on our promise to keep you operational and your satisfaction is paramount to everything we do.

    Contact us