Secure Checkout
UK-Based Company
Manufacturer Warranty
Call Us: 0800 978 8988
SKU: 9da187a7a191 Categories: , , Brand: Eaton

Eaton Loadstar AC/DC Central Battery System - 9da187a7a191

  • ✔ Trusted UK Supplier
  • ✔ Fast UK Delivery Available
  • ✔ Manufacturer Warranty Included
  • ✔ Expert Advice Available
  • ✔ Protects equipment from power loss
  • ✔ Prevents downtime and data loss
  • ✔ Suitable for business and home setups
  • Order Now. Speak to a Specialist. Call 0800 978 8988.
  • ETA will be advised upon ordering or call us.

Tailor to your needs. Speak to a Specialist.
Call: 0800 978 8988

Please email me when stock is available

The Loadstar range of AC/AC static inverter units offer the opportunity to create a discreet emergency lighting system, utilising suitable standard mains luminaires without modification. Small or decorative compact luminaires can also be easily incorporated.

Loadstar AC/AC systems offer many benefits, including higher light levels in emergency mode, as all lamps in the luminaire are usually energised by the emergency supply.

Mains voltage and lower currents enable cables of smaller cross-sectional areas to be used with low voltage AC/DC systems, without unacceptable levels of voltage drop. The proven and reliable modular design ensures a cost-effective emergency lighting solution.

System Reference
230V in / 230V out
Inverter Power
Rating (kVA)
Output Watts
(W)
1 Hour Autonomy Cubicle Arrangement
2 Hr Autonomy
3Hr Autonomy
AC1KVA/850/SLR* 1 850 931CBI 931CBI 931CBI
AC2KVA/1700/SLR* 2 1700 931CBI 932CBI 932CBI
AC2.5KVA/2125/SLR* 2.5 2125 931CBI 932CBI 932CBI
AC3KVA/2550/SLR* 3 2550 932CBI 932CBI 932CBI
AC4KVA/3400/SLR* 4 3400 932CBI 932CBI 932CBI
AC5KVA/4250/SLR* 5 4250 934CBI 934CBI 934CBI
AC6KVA/5100/SLR* 6 5100 934CBI 934CBI 932CI + 932B3
AC7.5KVA/6375/SLR* 7.5 6375 934CBI 932CI + 932B3 932CI + 934B2
AC8KVA/6800/SLR* 8 6800 934CBI 932CI + 932B3 932CI + 934B3
AC9KVA/7650/SLR* 9 7650 932CI + 932B3 932CI + 934B2 932CI + 934B3
AC10KVA/8500/SLR* 10 8500 932CI + 932B3 932CI + 932B2 932CI + 934B3
AC11KVA/9350/SLR* 11 9350 932CI + 932B3 932CI + 932B3 932CI + 2 x 932B3
AC12KVA/10200/SLR* 12 10200 932CI + 932B3 932CI + 932B3 932CI + 2 x 932B3
AC13KVA/11050/SLR* 13 11050 932CI + 932B3 932CI + 932B3 932CI + 932B3 + 934B3
AC14KVA/11900/SLR* 14 11900 932CI + 932B3 932CI + 932B3 932CI + 932B3 + 934B3
AC15KVA/12750/SLR* 15 12750 932CI + 932B3 932CI + 2 x 932B3 932CI + 932B3 + 934B3
AC16KVA/13600/SLR* 16 13600 932CI + 932B3 932CI + 2 x 932B3 932CI + 2 x 934B3
AC17.5KVA/14875/SLR* 17.5 14875 934CI + 934B2 934CI + 934B3 + 932B1 934CI + 3 x 932B3
AC18KVA/15300/SLR* 18 15300 934CI + 934B2 934CI + 934B3 + 932B3 934CI + 3 x 932B3
AC19KVA/16150/SLR* 19 16150 934CI + 934B2 934CI + 934B3 + 932B3 934CI + 2 x 934B3
AC20KVA/17000/SLR* 20 17000 934CI + 934B3 934CI + 2 x 934B2 934CI + 932B3 + 2 x 934B3
AC21KVA/17850/SLR* 21 17850 934CI + 932B3 + 932B1 934CI + 2 x 934B2 934CI + 932B3 + 2 x 934B3
AC22KVA/18700/SLR* 22 18700 934CI + 932B3 + 932B1 934CI + 3 x 932B3 934CI + 932B3 + 2 x 934B3
AC23KVA/19550/SLR* 23 19550 934CI + 932B3 + 932B1 934CI + 3 x 932B3 934CI + 932B2 + 2 x 934B3
AC24KVA/20400/SLR* 24 20400 934CI + 934B3 934CI + 3 x 932B3 934CI + 2 x 934B3 + 932B2
AC25KVA/21250/SLR* 25 21250 934FC + 932I + 934B3 934FC + 932I + 3 x 932B3 934FC + 932I + 2 x 934B3 + 932B3

AC/AC SLR Range, 0.85 Power Factor (400V in / 400V out)

System Reference
400V in / 400V out
Inverter Power
Rating (kVA)
Output
Watts (W)
1 Hour Autonomy Cubicle Arrangement
2 Hr Autonomy
3 Hr Autonomy
AC26KVA/22100/SLR*/TPN4W 26 22100 934FC + 934I + 2 x 932B3 934FC + 934I + 2 x 934B3 934FC + 934I + 2 x 934B3 + 2 x 932B3
AC28KVA/23800/SLR*/TPN4W 28 23800 934FC + 934I + 934B3 + 932B1 934FC + 934I + 2 x 934B3 + 932B3 934FC + 934I + 3 x 934B3
AC30KVA/25500/SLR*/TPN4W 30 25500 934FC + 934I + 2 x 932B3 934FC + 934I + 2 x 934B3 + 932B2 934FC + 934I + 4 x 934B3
AC32KVA/27200/SLR*/TPN4W 32 27200 934FC + 934I + 934B3 + 932B3 934FC + 934I + 2 x 934B3 + 932B2 934FC + 934I + 4 x 934B3
AC34KVA/28900/SLR*/TPN4W 34 28900 934FC + 934I + 934B3 + 932B3 934FC + 934I + 2 x 934B3 + 932B3 934FC + 934I + 4 x 934B3 + 934B1
AC36KVA/30600/SLR*/TPN4W 36 30600 934FC + 934I + 934B3 + 932B3 934FC + 934I + 2 x 934B3 + 932B3 934FC + 934I + 4 x 934B3 + 934B1
AC38KVA/32300/SLR*/TPN4W 38 32300 934FC + 2 x 932I + 934B3 + 932B3 934FC + 2 x 932I + 3 x 934B3 934FC + 2 x 932I + 4 x 934B3 + 934B1
AC40KVA/34000/SLR*/TPN4W 40 34000 934FC + 2 x 932I + 2 x 934B3 934FC + 2 x 932I + 3 x 934B3 934FC + 2 x 932I + 5 x 934B3
AC42KVA/35700/SLR*/TPN4W 42 35700 934FC + 2 x 932I + 2 x 934B3 934FC + 2 x 932I + 4 x 934B3 934FC + 2 x 932I + 3 x 934B3 + 3 x 932B3
AC44KVA/37400/SLR*/TPN4W 44 37400 934FC + 2 x 932I + 3 x 932B3 934FC + 2 x 932I + 4 x 934B3 934FC + 2 x 932I + 5 x 934B3
AC46KVA/39100/SLR*/TPN4W 46 39100 934FC + 2 x 932I + 3 x 932B3 934FC + 2 x 932I + 4 x 934B3 + 934B1 934FC + 2 x 932I + 3 x 934B3 + 3 x 932B3
AC48KVA/40800/SLR*/TPN4W 48 40800 934FC + 2 x 932I + 2 x 934B3 + 932B3 934FC + 2 x 932I + 4 x 934B3 + 934B1 934FC + 2 x 932I + 6 x 934B3
AC50KVA/42500/SLR*/TPN4W 50 42500 934FC + 934I + 932I + 2 x 934B3 + 932B3 934FC + 934I + 932I + 4 x 934B3 + 934B1 934FC + 934I + 932I + 6 x 934B3
AC52KVA/44200/SLR*/TPN4W 52 44200 934FC + 934I + 932I + 2 x 934B3 + 932B3 934FC + 934I + 932I + 4 x 934B3 + 934B1 934FC + 934I + 932I + 4 x 934B3 + 4 x 932B3
AC54KVA/45900/SLR*/TPN4W 54 45900 934FC + 934I + 932I + 2 x 934B3 + 932B2 934FC + 934I + 932I + 4 x 934B3 + 934B1 934FC + 934I + 932I + 4 x 934B3 + 4 x 932B3
AC56KVA/47600/SLR*/TPN4W 56 47600 934FC + 934I + 932I + 2 x 934B3 + 932B2 934FC + 934I + 932I + 5 x 934B3 934FC + 934I + 932I + 4 x 934B3 + 4 x 932B3
AC58KVA/49300/SLR*/TPN4W 58 49300 934FC + 934I + 932I + 2 x 934B3 + 932B2 934FC + 934I + 932I + 4 x 934B3 + 934B1 934FC + 934I + 932I + 4 x 934B3 + 4 x 932B3
AC60KVA/51000/SLR*/TPN4W 60 51000 934FC + 934I + 932I + 2 x 934B3 + 932B3 934FC + 934I + 932I + 4 x 934B3 + 934B1 934FC + 934I + 932I + 4 x 934B3 + 4 x 932B3

* Denotes the system autonomy i.e. AC1KVA/850/SLR3 = 3Hr Backup Autonomy

≈ Denotes cubicles size/quantity information is available on application

NOTE: The above solutions may change depending on batteries availability

AC/AC SLR Range, Unity Power Factor

System Reference Inverter Power
Rating (kVA
)
Output
Watts (W)
1 Hour Autonomy Cubicle Arrangement
2 Hr Autonomy
3 Hr Autonomy
AC1KVA/1000/SLR3* 1.0 1000
AC2KVA/2000/SLR* 2.0 2000
AC2.5KVA/2500/SLR* 2.5 2500
AC3KVA/3000/SLR* 3.0 3000
AC4KVA/4000/SLR* 4.0 4000
AC5KVA/5000/SLR* 5.0 5000
AC6KVA/6000/SLR* 6.0 6000
AC7.5KVA/7500/SLR* 7.5 7500
AC8KVA/8000/SLR 8.0 8000
AC9KVA/7650/SLR* 9.0 9000
AC10KVA/1000/SLR* 10.0 10000
AC11KVA/11000/SLR* 11.0 11000
AC12KVA/12000/SLR* 12.0 12000
AC13KVA/13000/SLR* 13.0 13000
AC14KVA/14000/SLR* 14.0 14000
AC15KVA/15000/SLR* 15.0 15000
AC16KVA/16000/SLR* 16.0 16000
AC17.5KVA17500/SLR* 17.5 17500
AC18KVA/18000/SLR* 18.0 18000
AC19KVA/19000/SLR* 19.0 19000
AC20KVA/20000/SLR* 20.0 20000
AC21KVA/21000/SLR* 21.0 21000
AC22KVA/22000/SLR* 22.0 22000
AC23KVA/23000/SLR* 23.0 23000
AC24KVA/24000/SLR* 24.0 24000
AC25KVA/25000/SLR* 25.0 25000
AC26KVA/26000/SLR* 26.0 26000
AC28KVA/28000/SLR* 28.0 28000
AC30KVA/30000/SLR* 30.0 30000
AC32KVA/32000/SLR* 32.0 32000
AC34KVA/34000/SLR* 34.0 34000
AC36KVA/36000/SLR* 36.0 36000
AC38KVA/38000/SLR* 38.0 38000
AC40KVA/40000/SLR* 40.0 40000
AC42KVA/42000/SLR* 42.0 42000
AC44KVA/44000/SLR* 44.0 44000
AC46KVA/46000/SLR* 46.0 46000
AC48KVA/48000/SLR* 48.0 48000
AC50KVA/50000/SLR* 50.0 50000
AC52KVA/52000/SLR* 52.0 52000
AC54KVA/54000/SLR* 54.0 54000
AC56KVA/56000/SLR* 56.0 56000
AC58KVA/58000/SLR* 58.0 58000
AC60KVA/60000/SLR* 60.0 60000

* Denotes the system autonomy i.e. AC1KVA/850/SLR3 = 3Hr Backup Autonomy

≈ Denotes cubicles size/quantity information is available on application

Nationwide Onsite Maintenance is as easy as saying Bronze, Silver, Gold, Platinum.

1: Plug and Play (400VA-3kVA) – Extended Warranty Contracts and Maintenance contracts

For plug & play UPS Critical Power offers you a full range of distributed service packs. These competitively priced turn-key solutions optimize your UPS performances and enhance the availability of your equipment while meeting your financial constraints and technical requirements.

Warranty Plus Extends your standard warranty up to 6 years, next working day replacement* with labour or without. Green tick
Intervention, Provides one preventative maintenance visit, planned visit inside our outside hours. Green tick
Battery Plus, Provides replacement batteries to site, next working day replacement or same day Green tick

2: Hardwired (4kVA Upwards including Three Phase UPS) – Maintenance Contracts

No matter what, your UPS, Generator, Cooling, Switchgear or Electrical Hardware must be ready to perform at all times. While every power solution we supply is backed-up by a comprehensive warranty with the manufacturer, maintenance plans to ensure business continuity are highly recommended, particularly for UPS systems from 4kVA. In particular, the battery set is of prime importance, and must be in good working order. With other consumables, such as fans and DC capacitors requiring regular maintenance and inspection logs reviewed to predict potential future problems.

Services Included

Silver Level

Gold Level

Platinum Level

Platinum Plus

 

Technical Hotline 24/7 Yes Yes Yes Yes Green tick
Preventative Maintenance Yes Yes Yes Yes Green tick
Remote Monitoring 24/7 Yes Yes Yes Yes Green tick
Firmware Upgrades Yes Yes Yes Yes Green tick
Emergency Response Yes Yes Yes Yes Green tick
Labour Yes Yes Yes Yes Green tick
Parts Yes Yes Yes option Green tick
Monthly Event/Status Report option option option option Green tick
Onsite Crash Kit option option option onsite Green tick
Response Time 12 working hours 8 working hours 4 clock hours 4 clock hours Green tick
Guaranteed Fix time 4 Clock hours Green tick

3: 24×7 Remote Monitoring Contracts –

Remote monitoring of UPS, Generators, Air Conditioning, Site Access and Environmental Systems is essential to allow swift offsite investigation of fault reports and real-time monitoring of the site status, allowing the correct response to be created and dispatched to site.

Engineer Installation and configuration during normal hours Green tick
24×7 flexible status and remote monitoring. Green tick
Encrypted communication, allowing safe offsite monitoring Green tick
Alarms and events emailed and SMS texted automatically Green tick
Firewall Friendly Green tick
Cloud based status overview and multiple sites status on one screen Green tick
Allows First Fix Response to Site Green tick

4. IR Thermal Imaging Surveys – Infrared electrical inspection. Infrared electrical testing finds hot, dangerous problems quickly. Infrared electrical inspections find hot spots caused by defects in connections and components. – Contact us for more information.

Detect system overloads, loose defective components and damaged switchgear. Infrared electrical testing finds hot, dangerous problems quickly. Infrared electrical inspections find hot spots caused by defects in connections and components.

Infrared thermography is used to find areas of excess heat (caused by increased resistance) so that problems can be corrected before a component fails, causing damage to the component, creating safety hazards and productivity loss. Because increased heating is a sign of failure, infrared is the best diagnostic tool available for finding these hot connections in the early stages of degeneration.

5. Switchgear – Contact us for more information.

Switchgear maintenance is essential for efficient save plant operation and prolonged life span in the field Switchgear should be maintained as follows.

  • Live Maintenance – Unintrusive and consists of taking metering values, carrying out visual inspections and a thermal imaging survey of the switchboard. This is recommended to be carried out yearly.
  • Breaker Maintenance – Switchboard would need to be Isolated and all ACB’s and MCCB’s are maintained including visual and mechanical checks, greasing and secondary injection testing of the trip units. This is recommended to be carried out every 2 years.
  • Full Isolated Maintenance – Switchboard would need to be fully isolated from upstream supplies (HV). Breakers are maintained as per the above but also full maintenance carried out of the Switchboard to clean all compartments and carry out tightness checking of busbars and terminations etc. This is recommended to be carried out every 4 years.

We are here when you need us most

As a client of Critical Power Supplies you can expect 24×7 support whether on the phone, email or on site because we always deliver on our promise to keep you operational and your satisfaction is paramount to everything we do.

Contact us