Gone in a FLASH
Black Friday Deals

Tripp Lite PDUMNH20HVAT1 3.8kW 200–240V Single-Phase ATS/Monitored PDU - 8 C13 and 2 C19 Outlets, Dual C20 Inlets, 12 ft. Cords, Network Card, 1U, TAA
This product has been Discontinued
- Description
Single-Phase 20A ATS PDU Distributes and Monitors Network-Grade Power in Real Time This monitored PDU provides real-time remote monitoring of voltage, frequency and load levels via its built-in network interface. Ideal for network IT applications, small computer rooms and other equipment rack applications, the PDUMNH20HVAT1 features eight C13 and two C19 200–240V outlets for connecting equipment. Dual 12-foot (3.7-meter) power cords with C20 inputs connect to separate primary and secondary mains circuits, backup generators, UPS systems or utility power grids, including out-of-phase sources. Switches from Primary to Secondary Power Source in Milliseconds Automatic transfer switching (ATS) allows the PDU to switch to the secondary source within 2–7 milliseconds, should the primary source fail or become unstable, to ensure your connected equipment operates without interruption. An on-board ATS processor constantly evaluates the power quality of both input sources. It prevents switching if the secondary source is unavailable or of lower quality than the primary source. Pre-Installed WEBCARDLX Network Interface Offers 24/7 Remote Access for Monitoring and Control The HTML5-based WEBCARDLX network interface enables full remote access for PDU status monitoring and email notifications via secure web browser, SNMP, telnet or SSH. The latest version of PowerAlert Device Manager (PADM20) provides enhanced remote management capabilities, including customizable dashboard graphs to fit user preferences. The PADM20 upgrade and Tripp Lite’s PowerAlert Element Manager (PAEM) form a powerful tool for expanding maintenance functions in large installations, including firmware update checks and backup and restoration of device configurations. Digital Load Meter Helps Prevent Potentially Expensive Overloads A digital ammeter reports the total load for all connected equipment. Monitoring amperage helps ensure load levels remain well below maximum capacity with no danger of overload that could lead to costly downtime or damaged equipment. Maintaining proper load levels, even while adding new equipment, can keep your TCO (total cost of ownership) low. Mounts into 1U of Rack Space Use the included mounting hardware to install the all-metal housing into 1U of space in an EIA-standard 19-inch rack. TAA-Compliant for GSA Schedule Purchases The PDUMNH20HVAT1 is compliant with the Federal Trade Agreements Act (TAA), which makes it eligible for GSA (General Services Administration) Schedule and other federal procurement contracts.
- Technical Data
Design On/off switch Yes Type Single-phase PDU types Metered, Monitored Mounting Horizontal Display LCD Product colour Black Rack capacity 1U Ports & interfaces USB ports quantity 2 AC outlets quantity 10 AC outlet(s) AC outlet types C13 coupler, C19 coupler Power plug C20 coupler Serial ports quantity 1 Ethernet LAN (RJ-45) ports 1 Features Cable length 3.66 m LED indicators Yes Management features Monitoring Current, Voltage Ergonomics Cable length 3.66 m LED indicators Yes Display LCD Power Maximum power 3840 W Nominal input voltage 208 – 240 V Output voltage 200 – 240 V Maximum current 20 A AC input frequency 50/60 Hz Weight & dimensions Weight 4.69 kg Width 440.2 mm Depth 375.2 mm Height 43.7 mm Package width 528.3 mm Package depth 594.4 mm Package height 137.2 mm Package weight 7.71 kg Packaging data Package width 528.3 mm Package depth 594.4 mm Package height 137.2 mm Package weight 7.71 kg Operational conditions Storage temperature (T-T) -30 – 50 °C Operating relative humidity (H-H) 5 – 95% Technical details Sustainability compliance Yes Sustainability certificates CE, RoHS Logistics data Products per master (outer) case 1 pc(s) Country of origin Taiwan - Onsite Maintenance
Onsite Maintenance is as easy as 1, 2, 3, 4. Contact us for further information 24×7 on our sales number.
1: Plug and Play (400-3kVA) – Extended Warranty Contracts from 1 to 5 years from £5.99 per month ex VAT
For plug & play UPS Critical Power offers you a full range of distributed service packs. These competitively priced turn-key solutions optimize your UPS performances and enhance the availability of your equipment while meeting your financial constraints and technical requirements.
Warranty Plus Extends your warranty up to 3 years, next working day replacement Warranty Plus Extends your warranty up to 5 years, next working day replacement Intervention, Provides one preventative maintenance visit, planned visit Battery Plus, Provides replacement batteries to site, next working day replacement Warranty One Extends your warranty up to 1 year, next working day replacement 2: Hardwired (4kVA Upwards– Onsite Maintenance Contracts from 1 to 5 years from £49.99 per month ex VAT
No matter what, your UPS, Generator, Cooling, Switchgear or Electrical Hardware must be ready to perform at all times. While every power solution we supply is backed-up by a comprehensive warranty with the manufacturer, maintenance plans to ensure business continuity are highly recommended, particularly for UPS systems from 1kVA. In particular, the battery set is of prime importance, and must be in good working order. With other consumables, such as fans and DC capacitors requiring regular maintenance and inspection logs reviewed to predict potential future problems.
Services Included
Silver Level
Gold Level
Platinum Level
Technical Hotline 24/7 Yes Yes Yes Preventative Maintenance Yes Yes Yes Remote Monitoring 24/7 Yes Yes Yes Firmware Upgrades Yes Yes Yes Emergency Response Yes Yes Yes Labour Yes Yes Yes Parts Yes Yes Yes Monthly Event/Status Report option option option Onsite Crash Kit option option option Response Time 12 working hours 8 working hours 4 clock hours 3: 24×7 Remote Monitoring Contracts from 1 month to 5 years from £29.99 per month ex VAT
Remote monitoring of UPS, Generators, Air Conditioning, Site Access and Environmental Systems is essential to allow swift offsite investigation of fault reports and real-time monitoring of the site status, allowing the correct response to be created and dispatched to site.
Engineer Installation and configuration during normal hours 24×7 flexible status and remote monitoring. Encrypted communication, allowing safe offsite monitoring Alarms and events emailed and SMS texted automatically Firewall Friendly Cloud based status overview and multiple sites status on one screen Allows First Fix Response to Site 4. IR Thermal Imaging Surveys – Infrared electrical inspection. Infrared electrical testing finds hot, dangerous problems quickly. Infrared electrical inspections find hot spots caused by defects in connections and components.
Detect system overloads, loose defective components and damaged switchgear. Infrared electrical testing finds hot, dangerous problems quickly. Infrared electrical inspections find hot spots caused by defects in connections and components.
Infrared thermography is used to find areas of excess heat (caused by increased resistance) so that problems can be corrected before a component fails, causing damage to the component, creating safety hazards and productivity loss. Because increased heating is a sign of failure, infrared is the best diagnostic tool available for finding these hot connections in the early stages of degeneration.
Our brands
Shown below is a small selection of some of our customers we have helped through understanding clients challenges and implementing our unique approach to helping clients built around: listening to our clients, understanding the challenges they face and providing a range of options which compliments their requirements. Our aim is not to sell products but provide solutions with the help of our in house Power Consultants and Electricians.






