Gone in a FLASH

Black Friday Deals

SKU: SRGROUND Categories: , Brand: Tripp Lite

Tripp Lite SRGROUND SmartRack Copper Bus Grounding Bar

  • Available to pre-order.
  • ETA will be advised upon ordering or call us on 0800 978 8988 for leadtime.

£124.4 Ex VAT
£149.28 Inc VAT

Delivery Costs

Find below some of our pricing costs for Critical Power Supplies online store.

England, Wales and Scottish Lowlands

2 to 3 Working Days - £4.99.
Next Working Day - £9.99.
Pre Noon, Pre 10:30am - Contact Us.

Scottish Lowlands Postcodes
AB1 - AB3, AB23, AB30 - AB36, AB41 - AB45, AB51 - AB55, DD4, DD7, DD8, DD11, FK17, G84, PA20 - PA33, PA35 - PA37, PA41 - PA49, PA60 - PA68, PA70 - PA78, FK10, DG1 - DG14, DG16, DD1, DD2, DG7, KA1 - KA30, PA17, G60 - G62, G64, G66, G81, EH21, EH31 - EH36, EH39, EH40 - EH42, G46, G77, G78, PA1, PA3 - PA10, PA12, EH1 - EH10, EH12 - EH17, EH21, EH28, EH29, FK1 - FK6, DD6, KY1 - KY12, KY14 - KY16, G1 - G5, G9, G11, G12, G14, G15, G20, G21, G31, G32, G40 - G43, G45, G51, G53, G76, IV1 - IV28, IV40 - IV49, IV51 - IV56, KW1 - KW3, KW5 - KW14, PA39, PA40, PH19 - PH25, PH30 - PH44, PA10, PA13, PA15, PA16, PA18, PA19, EH10, EH18, EH19, EH23 - EH26, EH37, AB38, AB56, IV30 - IV32, IV36, EH46, G33, G67 - G69, G71 - G75, ML1 - ML11, KW1, KW15 - KW17, PH1 - PH10, PH13 - PH18, EH26, EH38, EH43 - EH45, TD1 - TD12, TD14, TD15, ZE1 - ZE3, FK6, G63, EH27, EH47 - EH49, EH52 - EH54, HS1 - HS9

Highlands, Northern Ireland, Channel Islands and Ireland

  • Scottish Highlands
    3 to 5 Working Days - £20

    Scottish Highlands Postcodes
    AB32, AB36 - AB38, AB40 - AB42, AB55, AB56, FK17 - FK99, G83, HS1 - HS9, IV1 - IV29, IV33 - IV63, KA27, KA28, KY1 - KY16, KW1 - KW18, PA20 - PA49, PA60 - PA78, PH17 - PH26, PH30 - PH44, PH49, PH50, ZE1 - ZE4

  • Northern Ireland
    3 to 5 Working Days - £50

  • Channel Islands
    3 to 5 Working Days - £25

  • Ireland
    5 to 7 Working Days - £99

  • Western Europe
    5 to 7 Working Days - £150 DAP
    DAP / Delivered at Place - The seller is deemed to have delivered when the goods are placed at the disposal of the buyer on the arriving means of transport and ready for unloading at the named place of destination. Under DAP terms, the buyer is liable for the freight insurance, import taxes, customs brokerage, and any expenses incurred to unload the cardo from the container at the final destination.

Purchase this item and get 1244 Points - equivalent to the value of £1.24
Add to Wishlist

All major debit and credit cards accepted.

  • Description

    The SRGROUND is a full length (42U) bus grounding bar made from heavy-gauge solid copper that attaches to Rack Enclosure Cabinets or Open Frame Racks to provide convenient ground contact for standard rackmount equipment. Every other U space has a drilled and tapped hole to allow a ground wire “jumper” to be installed. The jumper then bridges to the individual pieces of equipment, with grounding straps, allowing a direct path to ground rather than going through surrounding equipment. The SRGROUND can mount in a Tripp Lite enclosure in two ways, it can be screwed into the Rack Enclosures (hardware included) or it can be installed using the tool less mounting buttons in the Open Frame Racks. Full length (42U) bus grounding bar made from heavy-gauge solid copper that attaches to Rack Enclosure Cabinets or Open Frame Racks to provide convenient ground contact for standard rackmount equipment Every other U space has a drilled and tapped hole to allow a ground wire “jumper” to be installed The jumper then bridges to the individual pieces of equipment, with grounding straps, allowing a direct path to ground rather than going through surrounding equipment Can mount in a Tripp Lite enclosure in two ways: it can be screwed into the Rack Enclosures (hardware included), or it can be installed using the tool less mounting buttons in the Open Frame Racks

  • Technical Data
    Features
    Product colourBlack, Brown
    Harmonized System (HS) code7409.19.1000
    Country of originChina
    Weight & dimensions
    Package width91.4 mm
    Package height61 mm
    Package depth1993.9 mm
    Package weight2.49 kg
    Width15.9 mm
    Weight1.81 kg
    Height1917.7 mm
    Depth6.4 mm
    Packaging data
    Package width91.4 mm
    Package height61 mm
    Package depth1993.9 mm
    Package weight2.49 kg
    Colour
    Product colourBlack, Brown
    Technical details
    Sustainability certificatesRoHS
    Master (outer) case GTIN (EAN/UPC)10037332154818
    Logistics data
    Master (outer) case width29.2 cm
    Master (outer) case length2.01 m
    Master (outer) case height14 cm
    Master (outer) case gross weight16.3 kg
    Products per master (outer) case6 pc(s)
    Harmonized System (HS) code7409.19.1000
  • Onsite Maintenance

    Onsite Maintenance is as easy as 1, 2, 3, 4. Contact us for further information 24×7 on our sales number.

    1: Plug and Play (400-3kVA) – Extended Warranty Contracts from 1 to 5 years from £5.99 per month ex VAT

    For plug & play UPS Critical Power offers you a full range of distributed service packs. These competitively priced turn-key solutions optimize your UPS performances and enhance the availability of your equipment while meeting your financial constraints and technical requirements.

    Warranty Plus Extends your warranty up to 3 years, next working day replacementGreen tick
    Warranty Plus Extends your warranty up to 5 years, next working day replacementGreen tick
    Intervention, Provides one preventative maintenance visit, planned visitGreen tick
    Battery Plus, Provides replacement batteries to site, next working day replacementGreen tick
    Warranty One Extends your warranty up to 1 year, next working day replacementGreen tick

    2: Hardwired (4kVA Upwards– Onsite Maintenance Contracts from 1 to 5 years from £49.99 per month ex VAT

    No matter what, your UPS, Generator, Cooling, Switchgear or Electrical Hardware must be ready to perform at all times. While every power solution we supply is backed-up by a comprehensive warranty with the manufacturer, maintenance plans to ensure business continuity are highly recommended, particularly for UPS systems from 1kVA. In particular, the battery set is of prime importance, and must be in good working order. With other consumables, such as fans and DC capacitors requiring regular maintenance and inspection logs reviewed to predict potential future problems.

    Services Included

    Silver Level

    Gold Level

    Platinum Level

     

    Technical Hotline 24/7YesYesYesGreen tick
    Preventative MaintenanceYesYesYesGreen tick
    Remote Monitoring 24/7YesYesYesGreen tick
    Firmware UpgradesYesYesYesGreen tick
    Emergency ResponseYesYesYesGreen tick
    LabourYesYesYesGreen tick
    PartsYesYesYesGreen tick
    Monthly Event/Status ReportoptionoptionoptionGreen tick
    Onsite Crash KitoptionoptionoptionGreen tick
    Response Time12 working hours8 working hours4 clock hoursGreen tick

    3: 24×7 Remote Monitoring Contracts from 1 month to 5 years from £29.99 per month ex VAT

    Remote monitoring of UPS, Generators, Air Conditioning, Site Access and Environmental Systems is essential to allow swift offsite investigation of fault reports and real-time monitoring of the site status, allowing the correct response to be created and dispatched to site.

    Engineer Installation and configuration during normal hoursGreen tick
    24×7 flexible status and remote monitoring.Green tick
    Encrypted communication, allowing safe offsite monitoringGreen tick
    Alarms and events emailed and SMS texted automaticallyGreen tick
    Firewall FriendlyGreen tick
    Cloud based status overview and multiple sites status on one screenGreen tick
    Allows First Fix Response to SiteGreen tick

    4. IR Thermal Imaging Surveys – Infrared electrical inspection. Infrared electrical testing finds hot, dangerous problems quickly. Infrared electrical inspections find hot spots caused by defects in connections and components.

    Detect system overloads, loose defective components and damaged switchgear. Infrared electrical testing finds hot, dangerous problems quickly. Infrared electrical inspections find hot spots caused by defects in connections and components.

    Infrared thermography is used to find areas of excess heat (caused by increased resistance) so that problems can be corrected before a component fails, causing damage to the component, creating safety hazards and productivity loss. Because increased heating is a sign of failure, infrared is the best diagnostic tool available for finding these hot connections in the early stages of degeneration.

We are here when you need us most

As a client of Critical Power Supplies you can expect 24×7 support whether on the phone, email or on site because we always deliver on our promise to keep you operational and your satisfaction is paramount to everything we do.

Contact us