The Avocent Power Management Distribution Units (PM PDUs) include single-phase and three-phase models that support strip-level metering, outlet-level metering or outlet-level metering and switching. This advanced family of rack PDUs includes horizontal and vertical models for a variety of rack configurations in branch and remote offices.
The Avocent PM 2000 and PM 3000 PDUs support outlet-level metering and switching capability to provide data center professionals the tools they need to monitor, measure, reduce and manage their growing power consumption costs of IT equipment.
Thresholds can be created to allow data center teams to know before problems occur and minimize downtime caused by overloaded circuits. With the ability to support up to 22 kW and support for C19 outlets, the PM 2000 and PM 3000 PDUs are well positioned to support the high rack density found in organizations today.
The Avocent PM 1000 PDUs enable companies of all sizes to accurately measure the current, voltage and power for the entire strip and the circuits within. The PM 1000 PDUs include an LED display and a built-in browser interface for local and remote access to real-time data. The strip-level metering feature, along with the capability to set custom thresholds, allows companies to optimize their electrical infrastructure, without the risk of downtime due to overloaded circuits.
All of these PDUs include advanced features that consist of a built-in network port for access to the browser interface, daisy chain ports for easy installation and expansion and support for external, environmental sensors.
For a total solution, the PM 1000/2000/3000 devices can be used with other Avocent appliances for integrated IP access to the attached equipment, along with power measurement and/or control for improved remote management.
When used with the DSView® 3 management software users gain secure access and control across multiple locations. The optional DSView 3 Power Manager allows real-time and historical reporting of capacity, consumption and cost across single PDUs or groups of PDUs.
Design | |
---|---|
Mounting | Vertical |
Colour of product | Black |
Power | |
Maximum current | 32 A |
Maximum input current per phase | 32 A |
Ports & interfaces | |
Output connections | (21) C13 (3) C19 |
Input connection type | IEC309 |
I/O ports | 1 x 10/100/1000 Ethernet 2 x RJ-45 |
Ergonomics | |
Cable length | 3 m |
Operational conditions | |
Operating temperature (T-T) | 10 - 45 °C |
Storage temperature (T-T) | -40 - 65 °C |
Weight & dimensions | |
Dimensions (WxDxH) | 5.6 x 8 x 167.6 mm |
Weight (imperial) | 14.8 |
Certificates | |
Certification | UL, FCC, cUL, CE, VCCI, C-Tick, CB |
Part Number | PM1007V-401 |
---|
Onsite Maintenance is as easy as 1, 2, 3, 4. Contact us for further information 24x7 on our sales number.
1: Plug and Play (400-3kVA) - Extended Warranty Contracts from 1 to 5 years from £9.99 per month ex VAT
For plug & play UPS Critical Power offers you a full range of distributed service packs. These competitively priced turn-key solutions optimize your UPS performances and enhance the availability of your equipment while meeting your financial constraints and technical requirements.
Warranty Plus Extends your warranty up to 3 years, next working day replacement |
![]() |
Warranty Plus Extends your warranty up to 5 years, next working day replacement |
![]() |
Intervention, Provides one preventative maintenance visit, planned visit |
![]() |
Battery Plus, Provides replacement batteries to site, next working day replacement |
![]() |
Warranty One Extends your warranty up to 1 year, next working day replacement |
![]() |
2: Hardwired (4kVA Upwards– Onsite Maintenance Contracts from 1 to 5 years from £49.99 per month ex VAT
No matter what, your UPS, Generator, Cooling, Switchgear or Electrical Hardware must be ready to perform at all times. While every power solution we supply is backed-up by a comprehensive warranty with the manufacturer, maintenance plans to ensure business continuity are highly recommended, particularly for UPS systems from 1kVA. In particular, the battery set is of prime importance, and must be in good working order. With other consumables, such as fans and DC capacitors requiring regular maintenance and inspection logs reviewed to predict potential future problems.
Services Included |
Silver Level |
Gold Level |
Platinum Level |
|
Technical Hotline 24/7 |
Yes |
Yes |
Yes |
![]() |
Preventative Maintenance |
Yes |
Yes |
Yes |
![]() |
Remote Monitoring 24/7 |
Yes |
Yes |
Yes |
![]() |
Firmware Upgrades |
Yes |
Yes |
Yes |
![]() |
Emergency Response |
Yes |
Yes |
Yes |
![]() |
Labour |
Yes |
Yes |
Yes |
![]() |
Parts |
Yes |
Yes |
Yes |
![]() |
Monthly Event/Status Report |
option |
option |
option |
![]() |
Onsite Crash Kit |
option |
option |
option |
![]() |
Response Time |
12 working hours |
8 working hours |
4 clock hours |
![]() |
3: 24x7 Remote Monitoring Contracts from 1 month to 5 years from £29.99 per month ex VAT
Remote monitoring of UPS, Generators, Air Conditioning, Site Access and Environmental Systems is essential to allow swift offsite investigation of fault reports and real-time monitoring of the site status, allowing the correct response to be created and dispatched to site.
Engineer Installation and configuration during normal hours |
![]() |
24x7 flexible status and remote monitoring. |
![]() |
Encrypted communication, allowing safe offsite monitoring |
![]() |
Alarms and events emailed and SMS texted automatically |
![]() |
Firewall Friendly |
![]() |
Cloud based status overview and multiple sites status on one screen |
![]() |
Allows First Fix Response to Site |
![]() |
4. IR Thermal Imaging Surveys - Infrared electrical inspection. Infrared electrical testing finds hot, dangerous problems quickly. Infrared electrical inspections find hot spots caused by defects in connections and components.
Detect system overloads, loose defective components and damaged switchgear. Infrared electrical testing finds hot, dangerous problems quickly. Infrared electrical inspections find hot spots caused by defects in connections and components.
Infrared thermography is used to find areas of excess heat (caused by increased resistance) so that problems can be corrected before a component fails, causing damage to the component, creating safety hazards and productivity loss. Because increased heating is a sign of failure, infrared is the best diagnostic tool available for finding these hot connections in the early stages of degeneration.
.