Critical Power Supplies - Facebook-double Critical Power Supplies - Twitter-double Critical Power Supplies - Linkedin-double Critical Power Supplies - Google-plus-double 24 Hour: 0800 978 8988 Int: +44 (0)1844 340122
Find Your Supplies >

Tripp lite smartonline 3-phase in/1-phase out 200-240v 10kva 7kw on-line, double-conversion ups, extended run, snmp, webcard pre-installed, 6u rack/tower, usb, db9 serial

Product (ex VAT):
Discontinued
Product (inc VAT):
Discontinued

Tripp Lite’s SmartOnline Rack/Tower On-Line 10kVA UPS System with Parallel Redundancy capability provides long-lasting battery backup for data centers, telecommunications, networks, industrial facilities, security, emergency systems and other critical applications that require high capacity, high availability and extended runtime. True on-line operation continuously transforms 3-phase input power into precision-regulated single-phase output to guarantee maximum equipment protection and stability. Supports parallel connection of up to four SU10KRT3/1X systems for scalable capacity to 40kVA and fault tolerant redundant UPS configurations. Accepts 3 phase 50/60Hz input at 200/346, 220/380, 230/400 or 240/415VAC and transforms output to single phase 200, 220, 230 or 240VAC. 3:1 crest factor offers support for non-linear and unbalanced output loading. Highly efficient operation in optional economy mode setting, saving BTU heat output and energy costs. Hardwire input and output connections support flexible electrical installation. Supports extended runtime operation with optional BP240V10RT3U rack/tower external battery packs (1 included). Three built-in communications ports support remote management and auto shutdown via RS232 or pre-installed SNMP network Ethernet connection. Auto-shutdown software included. Built-in Emergency Power Off (EPO) interface supports optional remote emergency shutdown. Front panel combination LCD/LED display with scroll and select buttons offer information on UPS status and site conditions, plus support for user-configurable options. SU10KRT3/1X bundle includes 3U power module and 3U external battery pack for 6U installation in 4 post racks or upright tower configuration with included mounting accessories.

Power
Output power7000W
Input operation voltage (min)220V
Input operation voltage (max)415V
Output operation voltage (min)200V
Output operation voltage (max)240V
Power supply input frequency50/60 Hz
Surge energy rating1980J
Maximum current50A
Emergency Power Off (EPO)Yes
Output power capacity (VA)10000 VA
Ports & interfaces
Serial ports quantity1
Battery
Battery recharge time5h
Typical backup time at half load5 min
Typical backup time at full load14 min
Replacement battery cartridgeBP240V10RT3U
Hot-swap batteryYes
Cold startYes
Design
Form factorRackmount/Tower
Colour of productBlack
MaterialSteel
DisplayLCD
Performance
UPS topologyDouble-conversion (Online)
Number of phases3
LED indicatorsYes
EMI/RFI noise filteringYes
Power protection featuresOver voltage, Under voltage
Noise level50 dB
Cooling typeActive
Audible alarmsYes
Operational conditions
Operating temperature (T-T)0 - 40 °C
Storage temperature (T-T)-15 - 50 °C
Operating relative humidity (H-H)0 - 95%
Certificates
CertificationCE EN62040-2, EN61000-4-5
RoHS complianceYes
Weight & dimensions
Package width56.64 cm
Package depth84.07 cm
Package height118.11 cm
Package weight218.5 kg
Part Number SU10KRT3/1X

Onsite Maintenance is as easy as 1, 2, 3, 4. Contact us for further information 24x7 on our sales number.

1: Plug and Play (400-3kVA) - Extended Warranty Contracts from 1 to 5 years from £9.99 per month ex VAT

For plug & play UPS Critical Power offers you a full range of distributed service packs. These competitively priced turn-key solutions optimize your UPS performances and enhance the availability of your equipment while meeting your financial constraints and technical requirements.

Warranty Plus Extends your warranty up to 3 years, next working day replacement
Critical Power Supplies - Tripp lite smartonline 3-phase in/1-phase out 200-240v 10kva 7kw on-line, double-conversion ups, extended run, snmp, webcard pre-installed, 6u rack/tower, usb, db9 serial image 1
Warranty Plus Extends your warranty up to 5 years, next working day replacement
Critical Power Supplies - Tripp lite smartonline 3-phase in/1-phase out 200-240v 10kva 7kw on-line, double-conversion ups, extended run, snmp, webcard pre-installed, 6u rack/tower, usb, db9 serial image 2
Intervention, Provides one preventative maintenance visit, planned visit  
Critical Power Supplies - Tripp lite smartonline 3-phase in/1-phase out 200-240v 10kva 7kw on-line, double-conversion ups, extended run, snmp, webcard pre-installed, 6u rack/tower, usb, db9 serial image 3
Battery Plus, Provides replacement batteries to site, next working day replacement
Critical Power Supplies - Tripp lite smartonline 3-phase in/1-phase out 200-240v 10kva 7kw on-line, double-conversion ups, extended run, snmp, webcard pre-installed, 6u rack/tower, usb, db9 serial image 4
Warranty One Extends your warranty up to 1 year, next working day replacement  
Critical Power Supplies - Tripp lite smartonline 3-phase in/1-phase out 200-240v 10kva 7kw on-line, double-conversion ups, extended run, snmp, webcard pre-installed, 6u rack/tower, usb, db9 serial image 5


2: Hardwired (4kVA Upwards– Onsite Maintenance Contracts from 1 to 5 years from £49.99 per month ex VAT

No matter what, your UPS, Generator, Cooling, Switchgear or Electrical Hardware must be ready to perform at all times. While every power solution we supply is backed-up by a comprehensive warranty with the manufacturer, maintenance plans to ensure business continuity are highly recommended, particularly for UPS systems from 1kVA. In particular, the battery set is of prime importance, and must be in good working order. With other consumables, such as fans and DC capacitors requiring regular maintenance and inspection logs reviewed to predict potential future problems.

Services Included

Silver Level

Gold Level

Platinum Level

 

Technical Hotline 24/7
Yes
Yes
Yes
Critical Power Supplies - Tripp lite smartonline 3-phase in/1-phase out 200-240v 10kva 7kw on-line, double-conversion ups, extended run, snmp, webcard pre-installed, 6u rack/tower, usb, db9 serial image 6
Preventative Maintenance
Yes
Yes
Yes
Critical Power Supplies - Tripp lite smartonline 3-phase in/1-phase out 200-240v 10kva 7kw on-line, double-conversion ups, extended run, snmp, webcard pre-installed, 6u rack/tower, usb, db9 serial image 7
Remote Monitoring 24/7
Yes
Yes
Yes
Critical Power Supplies - Tripp lite smartonline 3-phase in/1-phase out 200-240v 10kva 7kw on-line, double-conversion ups, extended run, snmp, webcard pre-installed, 6u rack/tower, usb, db9 serial image 8
Firmware Upgrades
Yes
Yes
Yes
Critical Power Supplies - Tripp lite smartonline 3-phase in/1-phase out 200-240v 10kva 7kw on-line, double-conversion ups, extended run, snmp, webcard pre-installed, 6u rack/tower, usb, db9 serial image 9
Emergency Response
Yes
Yes
Yes
Critical Power Supplies - Tripp lite smartonline 3-phase in/1-phase out 200-240v 10kva 7kw on-line, double-conversion ups, extended run, snmp, webcard pre-installed, 6u rack/tower, usb, db9 serial image 10
Labour
Yes
Yes
Yes
Critical Power Supplies - Tripp lite smartonline 3-phase in/1-phase out 200-240v 10kva 7kw on-line, double-conversion ups, extended run, snmp, webcard pre-installed, 6u rack/tower, usb, db9 serial image 11
Parts
Yes
Yes
Yes
Critical Power Supplies - Tripp lite smartonline 3-phase in/1-phase out 200-240v 10kva 7kw on-line, double-conversion ups, extended run, snmp, webcard pre-installed, 6u rack/tower, usb, db9 serial image 12
Monthly Event/Status Report
option
option
option
Critical Power Supplies - Tripp lite smartonline 3-phase in/1-phase out 200-240v 10kva 7kw on-line, double-conversion ups, extended run, snmp, webcard pre-installed, 6u rack/tower, usb, db9 serial image 13
Onsite Crash Kit
option
option
option
Critical Power Supplies - Tripp lite smartonline 3-phase in/1-phase out 200-240v 10kva 7kw on-line, double-conversion ups, extended run, snmp, webcard pre-installed, 6u rack/tower, usb, db9 serial image 14
Response Time
12 working hours
8 working hours
4 clock hours
Critical Power Supplies - Tripp lite smartonline 3-phase in/1-phase out 200-240v 10kva 7kw on-line, double-conversion ups, extended run, snmp, webcard pre-installed, 6u rack/tower, usb, db9 serial image 15

 

3: 24x7 Remote Monitoring Contracts from 1 month to 5 years from £29.99 per month ex VAT

Remote monitoring of UPS, Generators, Air Conditioning, Site Access and Environmental Systems is essential to allow swift offsite investigation of fault reports and real-time monitoring of the site status, allowing the correct response to be created and dispatched to site.

Engineer Installation and configuration during normal hours
Critical Power Supplies - Tripp lite smartonline 3-phase in/1-phase out 200-240v 10kva 7kw on-line, double-conversion ups, extended run, snmp, webcard pre-installed, 6u rack/tower, usb, db9 serial image 16
24x7 flexible status and remote monitoring.      
Critical Power Supplies - Tripp lite smartonline 3-phase in/1-phase out 200-240v 10kva 7kw on-line, double-conversion ups, extended run, snmp, webcard pre-installed, 6u rack/tower, usb, db9 serial image 17
Encrypted communication, allowing safe offsite monitoring    
Critical Power Supplies - Tripp lite smartonline 3-phase in/1-phase out 200-240v 10kva 7kw on-line, double-conversion ups, extended run, snmp, webcard pre-installed, 6u rack/tower, usb, db9 serial image 18
Alarms and events emailed and SMS texted automatically    
Critical Power Supplies - Tripp lite smartonline 3-phase in/1-phase out 200-240v 10kva 7kw on-line, double-conversion ups, extended run, snmp, webcard pre-installed, 6u rack/tower, usb, db9 serial image 19
Firewall Friendly
Critical Power Supplies - Tripp lite smartonline 3-phase in/1-phase out 200-240v 10kva 7kw on-line, double-conversion ups, extended run, snmp, webcard pre-installed, 6u rack/tower, usb, db9 serial image 20
Cloud based status overview and multiple sites status on one screen
Critical Power Supplies - Tripp lite smartonline 3-phase in/1-phase out 200-240v 10kva 7kw on-line, double-conversion ups, extended run, snmp, webcard pre-installed, 6u rack/tower, usb, db9 serial image 21
Allows First Fix Response to Site
Critical Power Supplies - Tripp lite smartonline 3-phase in/1-phase out 200-240v 10kva 7kw on-line, double-conversion ups, extended run, snmp, webcard pre-installed, 6u rack/tower, usb, db9 serial image 22


>

4. IR Thermal Imaging Surveys - Infrared electrical inspection. Infrared electrical testing finds hot, dangerous problems quickly. Infrared electrical inspections find hot spots caused by defects in connections and components.

Detect system overloads, loose defective components and damaged switchgear. Infrared electrical testing finds hot, dangerous problems quickly. Infrared electrical inspections find hot spots caused by defects in connections and components.

Infrared thermography is used to find areas of excess heat (caused by increased resistance) so that problems can be corrected before a component fails, causing damage to the component, creating safety hazards and productivity loss. Because increased heating is a sign of failure, infrared is the best diagnostic tool available for finding these hot connections in the early stages of degeneration.

.

Let us know what you think of this product

If you have purchased this from us in the past then please take some time to review the product, along with the quality of service you received from us!