Critical Power Supplies - Facebook-double Critical Power Supplies - Twitter-double Critical Power Supplies - Linkedin-double Critical Power Supplies - Google-plus-double 24 Hour: 0800 978 8988 Int: +44 (0)1844 340122
Find Your Supplies >

Cisco wave 8541 ethernet lan network management device

Product (ex VAT):
£140,344.40
Product (inc VAT):
£168,413.28
ETA 2 - 5 DAYS
Call for information

The Cisco® Wide Area Application Virtualization Engine (WAVE) product line consists of cost-effective, cloud-ready, video-enabled solutions for the branch office and the data center. With the industry’s broadest product portfolio and flexible deployment models, Cisco Wide Area Application Services (WAAS) cost-effectively addresses the WAN optimization needs of small, medium-sized, and large customers.

- Excellent for edge deployments at small branch and remote offices.
- Supports up to 200 TCP connections (upgradable to 400).
- Has 2 onboard Gigabit Ethernet ports.
- Provides 4-port inline I/O module (IOM) bundled by default, with optional upgrade to 8-port inline IOM.
- Hosts up to 2 virtual blades.

Networking
Ethernet LANYes
Ethernet LAN data rates10,100,1000 Mbit/s
Wi-FiNo
Cabling technology10/100/1000BASE-T
Ports & interfaces
Connectivity technologyWired
USB 2.0 ports quantity1
Serial ports quantity1
Ethernet LAN (RJ-45) ports8
AC (power) inYes
Power
AC input voltage90-264
Power supply650 W
Number of power supply units2
Design
Colour of productBlack
Rack mountingYes
Form factor2U
Certification47 CFR Part 15 Class A, AS/NZS CISPR22 Class A, CISPR22 Class A, EN 55022 Class A, ICES 003 Class A, VCCI Class A, EN 55024, EN 61000-3-2, EN 61000-3-3, CISPR24, GB9254-2008, KN22 Class A, and KN24 (allplatforms), UL 60950-1 Second Edition, 21 CFR 1040, CSA22.2-No. 60950-1 Second Edition, IEC/EN 60950-1 Second Edition, AS/NZS60950, and GB4943-1995 (all platforms)
Hard drive
Hard drive capacity4200 GB
Total storage capacity4200 GB
RAID supportYes
RAID levels5
Operational conditions
Storage temperature (T-T)-30 - 60 °C
Storage relative humidity (H-H)5 - 95%
Operating temperature (T-T)0 - 40 °C
Operating relative humidity (H-H)10 - 90%
Weight & dimensions
Package dimensions (WxDxH)780 x 550 x 259 mm
Package weight24 kg
Weight21.6 kg
Dimensions (WxDxH)429 x 632 x 87 mm
Technical details
RAID supportYes
RAID levels5
Rack mountingYes
Form factor2U
Certificates
Certification47 CFR Part 15 Class A, AS/NZS CISPR22 Class A, CISPR22 Class A, EN 55022 Class A, ICES 003 Class A, VCCI Class A, EN 55024, EN 61000-3-2, EN 61000-3-3, CISPR24, GB9254-2008, KN22 Class A, and KN24 (allplatforms), UL 60950-1 Second Edition, 21 CFR 1040, CSA22.2-No. 60950-1 Second Edition, IEC/EN 60950-1 Second Edition, AS/NZS60950, and GB4943-1995 (all platforms)
Part Number WAVE-8541-K9

Onsite Maintenance is as easy as 1, 2, 3, 4. Contact us for further information 24x7 on our sales number.

1: Plug and Play (400-3kVA) - Extended Warranty Contracts from 1 to 5 years from £9.99 per month ex VAT

For plug & play UPS Critical Power offers you a full range of distributed service packs. These competitively priced turn-key solutions optimize your UPS performances and enhance the availability of your equipment while meeting your financial constraints and technical requirements.

Warranty Plus Extends your warranty up to 3 years, next working day replacement
Critical Power Supplies - Cisco wave 8541 ethernet lan network management device image 1
Warranty Plus Extends your warranty up to 5 years, next working day replacement
Critical Power Supplies - Cisco wave 8541 ethernet lan network management device image 2
Intervention, Provides one preventative maintenance visit, planned visit  
Critical Power Supplies - Cisco wave 8541 ethernet lan network management device image 3
Battery Plus, Provides replacement batteries to site, next working day replacement
Critical Power Supplies - Cisco wave 8541 ethernet lan network management device image 4
Warranty One Extends your warranty up to 1 year, next working day replacement  
Critical Power Supplies - Cisco wave 8541 ethernet lan network management device image 5


2: Hardwired (4kVA Upwards– Onsite Maintenance Contracts from 1 to 5 years from £49.99 per month ex VAT

No matter what, your UPS, Generator, Cooling, Switchgear or Electrical Hardware must be ready to perform at all times. While every power solution we supply is backed-up by a comprehensive warranty with the manufacturer, maintenance plans to ensure business continuity are highly recommended, particularly for UPS systems from 1kVA. In particular, the battery set is of prime importance, and must be in good working order. With other consumables, such as fans and DC capacitors requiring regular maintenance and inspection logs reviewed to predict potential future problems.

Services Included

Silver Level

Gold Level

Platinum Level

 

Technical Hotline 24/7
Yes
Yes
Yes
Critical Power Supplies - Cisco wave 8541 ethernet lan network management device image 6
Preventative Maintenance
Yes
Yes
Yes
Critical Power Supplies - Cisco wave 8541 ethernet lan network management device image 7
Remote Monitoring 24/7
Yes
Yes
Yes
Critical Power Supplies - Cisco wave 8541 ethernet lan network management device image 8
Firmware Upgrades
Yes
Yes
Yes
Critical Power Supplies - Cisco wave 8541 ethernet lan network management device image 9
Emergency Response
Yes
Yes
Yes
Critical Power Supplies - Cisco wave 8541 ethernet lan network management device image 10
Labour
Yes
Yes
Yes
Critical Power Supplies - Cisco wave 8541 ethernet lan network management device image 11
Parts
Yes
Yes
Yes
Critical Power Supplies - Cisco wave 8541 ethernet lan network management device image 12
Monthly Event/Status Report
option
option
option
Critical Power Supplies - Cisco wave 8541 ethernet lan network management device image 13
Onsite Crash Kit
option
option
option
Critical Power Supplies - Cisco wave 8541 ethernet lan network management device image 14
Response Time
12 working hours
8 working hours
4 clock hours
Critical Power Supplies - Cisco wave 8541 ethernet lan network management device image 15

 

3: 24x7 Remote Monitoring Contracts from 1 month to 5 years from £29.99 per month ex VAT

Remote monitoring of UPS, Generators, Air Conditioning, Site Access and Environmental Systems is essential to allow swift offsite investigation of fault reports and real-time monitoring of the site status, allowing the correct response to be created and dispatched to site.

Engineer Installation and configuration during normal hours
Critical Power Supplies - Cisco wave 8541 ethernet lan network management device image 16
24x7 flexible status and remote monitoring.      
Critical Power Supplies - Cisco wave 8541 ethernet lan network management device image 17
Encrypted communication, allowing safe offsite monitoring    
Critical Power Supplies - Cisco wave 8541 ethernet lan network management device image 18
Alarms and events emailed and SMS texted automatically    
Critical Power Supplies - Cisco wave 8541 ethernet lan network management device image 19
Firewall Friendly
Critical Power Supplies - Cisco wave 8541 ethernet lan network management device image 20
Cloud based status overview and multiple sites status on one screen
Critical Power Supplies - Cisco wave 8541 ethernet lan network management device image 21
Allows First Fix Response to Site
Critical Power Supplies - Cisco wave 8541 ethernet lan network management device image 22


>

4. IR Thermal Imaging Surveys - Infrared electrical inspection. Infrared electrical testing finds hot, dangerous problems quickly. Infrared electrical inspections find hot spots caused by defects in connections and components.

Detect system overloads, loose defective components and damaged switchgear. Infrared electrical testing finds hot, dangerous problems quickly. Infrared electrical inspections find hot spots caused by defects in connections and components.

Infrared thermography is used to find areas of excess heat (caused by increased resistance) so that problems can be corrected before a component fails, causing damage to the component, creating safety hazards and productivity loss. Because increased heating is a sign of failure, infrared is the best diagnostic tool available for finding these hot connections in the early stages of degeneration.

.

Let us know what you think of this product

If you have purchased this from us in the past then please take some time to review the product, along with the quality of service you received from us!